Connected site
Sample equipment journey for an air-handling unit and two adjacent assets. Planned, observed and missing evidence stay distinct. No vendor system is connected in this build.
This is a 2D schematic, not a measured building drawing or a digital twin. Markers are not Core Sphere IDs.
AHU-01 · Design
Illustrative air-handling unit. The displayed label is an example, not a Core Sphere ID.
- Planned
- Approved model revision for the unit and service clearance.
- Observed
- Not connected. Design source is unavailable in this build.
- Missing
- Canonical equipment Sphere, model GUID and revision.
- Source
- Customer design/model system — ESID unresolved
Design
Canonical equipment Sphere, model GUID and revision.
Procure
Native PO/receipt IDs.
Deliver
Quantity, model and serial if present.
Install
Field capture revision and location.
Commission
Accepted test record.